Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Cleaning And Maintenance; Cleaning The Heating Element; Replacing The Fuse - EuroLite N-19 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für N-19:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

OPERATION

Switch the device on via the power switch.
CAUTION: The escape nozzle will heat up during operation. Therefore do not touch the nozzle until it
has cooled down completely.

CLEANING AND MAINTENANCE

We recommend a frequent cleaning of the device. Please use a soft lint-free and moistened cloth. Never use
alcohol or solvents!
Clean the escape nozzle frequently from smoke fluid residues. Clean out debris with vinegar and a pipe
cleaner, making sure that the hole is free of clogs.

Cleaning the heating element

The heating element should regularly be cleaned every 30 operational hours in order to avoid clogging. Use
smoke-machine cleaner available at your dealer.
Procedure:
Fill cleaner into empty tank. Run the machine several times in a well-ventilated room only. The number of
repetitions depends on the pollution level of the vaporizing elements. After use clean all remaining cleaner
and rinse the tank thoroughly with distilled water.
The EUROLITE smoke fluids we recommend are non-hazardous to the environment and can be disposed of
via the sewage system.
There are no serviceable parts inside the device except for the fuse. Maintenance and service operations are
only to be carried out by authorized dealers.

Replacing the fuse

If the fine-wire fuse of the device fuses, only replace the fuse by a fuse of same type and rating.
Before replacing the fuse, unplug mains lead.
Procedure:
Step 1: Unscrew the fuseholder on the rearpanel with a fitting screwdriver from the housing (anti-
clockwise).
Step 2: Remove the old fuse from the fuseholder.
Step 3: Install the new fuse in the fuseholder.
Step 4: Replace the fuseholder in the housing and fix it.
After a certain warm-up time, the device is ready to operate. Then the stand-by
lamp of the remote control lights up. By operating the smoke switch on the
remote control the smoke emission starts. It may happen that the stand-by
lamp turns off and the smoke emission stops. In this case the device is heating
up again and will be ready to operate in approx. 1-2 min. This process
guarantees an appropriate vaporization temperature and the best smoke
emission possible. The temperature is regulated by a high quality thermostat.
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
17/18
00076741.DOC, Version 3.1

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis