Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Procedure - FLORABEST FGW 84 A1 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für FGW 84 A1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly procedure

GB
15
30
Step 1
Connect the shelf brackets
and M6 nuts.
Please take note that only the lower hole of the shelf bracket
making the bolted connection.
Fix the reinforcing braces
and M6 nuts. Fix the reinforcing braces
M6x12 bolts and M6 nuts.
Fit the left wheel braces
using the M6x12 bolts, Ø6x16 washers and M6 nuts. The upper hole in
the wheel braces
14
14
Step 2
Assemble the handle holder
Fix the handle
7
between the short handle holders
them by means of the wood screws M4x16.
Fit the right stand braces
the M6x12 bolts, Ø6x16 washers and M6 nuts. The upper hole in the
stand braces
9
in needed to do this.
to the wheel braces
15
to the wheel braces
16
to the shelf brackets
16
14
with attached shelf brackets
is needed to do this.
14
15
and stand braces
8
9
with the fi tted handle to the fi re bowl
8
6
7
9
14
using M6x12 bolts
is used for
15
14
using M6x12 bolts
using
15
15
to the fi re bowl
6
16
as described in step 1.
9
8
and then secure
6
FGW 84 A1
6
using

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis