Herunterladen Inhalt Inhalt Diese Seite drucken

Noise/Vibration Information; Declaration Of Conformity; Delivery Scope - Bosch GCM 10 J Professional Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für GCM 10 J Professional:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Noise/Vibration Information

Measured sound values determined according
to EN 61029.
Typically the A-weighted noise levels of the
product are: Sound pressure level 102 dB(A);
Sound power level 115 dB(A). Uncertainty
K =3 dB.
Wear hearing protection!
Vibration total values (triax vector sum) deter-
mined according to EN 61029:
Vibration emission value a
2
tainty K =1.5 m/s
.
The vibration emission level given in this infor-
mation sheet has been measured in accordance
with a standardised test given in EN 61029 and
may be used to compare one tool with another.
It may be used for a preliminary assessment of
exposure.
The declared vibration emission level repre-
sents the main applications of the tool. However
if the tool is used for different applications, with
different accessories or poorly maintained, the
vibration emission may differ. This may signifi-
cantly increase the exposure level over the total
working period.
An estimation of the level of exposure to vibra-
tion should also take into account the times
when the tool is switched off or when it is run-
ning but not actually doing the job. This may sig-
nificantly reduce the exposure level over the to-
tal working period.
Identify additional safety measures to protect
the operator from the effects of vibration such
as: maintain the tool and the accessories, keep
the hands warm, organisation of work patterns.

Declaration of Conformity

We declare under our sole responsibility that
the product described under "Technical Data" is
in conformity with the following standards or
standardization documents: EN 61029 accord-
ing to the provisions of the directives
2004/108/EC, 2006/42/EC.
Bosch Power Tools
2
=3.0 m/s
, Uncer-
h
Technical file at:
Robert Bosch GmbH, Dept. PT/ESC,
D-70745 Leinfelden-Echterdingen
Dr. Egbert Schneider
Senior Vice President
Engineering
Robert Bosch GmbH, Power Tools Division
D-70745 Leinfelden-Echterdingen
Leinfelden, 11.02.2010
Assembly
Avoid unintentional starting of the ma-
chine. During assembly and for all work on
the machine, the power plug must not be
connected to the mains supply.

Delivery Scope

Before starting the operation of the machine for
the first time, check if all parts listed below have
been supplied:
– Chop and mitre saw with mounted saw blade
– Metal bar of tilt protector 26 with fastening
screw 31
– Locking knob 8
– Dust bag 21
– Material clamp 17
– Allen key/Phillips screwdriver 28
Note: Check the power tool for possible dam-
age.
Before further use of the machine, check that all
protective devices are fully functional. Any light-
ly damaged parts must be carefully checked to
ensure flawless operation of the tool. All parts
must be properly mounted and all conditions
fulfilled that ensure faultless operation.
Damaged protective devices and parts must be
immediately replaced by an authorised service
centre.
English | 31
Dr. Eckerhard Strötgen
Head of Product
Certification
1 609 929 W04 | (11/2/10)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis