Herunterladen Inhalt Inhalt Diese Seite drucken

Service - Salvis ProfiLine 800 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für ProfiLine 800:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

en
Hose
Pressure gauge
. Check to see whether the pressure is not less than the minimum or has not exceeded the maxi­
mum - gas pressures, refer to the table on Page 38 Chapter 9.1.1.
− If the pressure is too high: Install a pressure limiter.
− If the pressure is too low: Check the house installation / inform the gas supply company.
− Do not set and start up the appliance, if the gas-primary pressures have been exceeded or
fallen short of!
After connection and pressure check
. Close the connection nipple with the screw plug.
. Check all gas-bearing parts for tightness (leak spray).
. Screw front cover down securely.
. Connect the clamping cam.
11.

Service

● Have an annual inspection and maintenance carried out on the appliance. Maintenance tasks
include: safety, function and leak testing.
● The safety equipment should be inspected by a technical expert at least once a year, to ensure
that it is in proper condition.
● Installation, service and repair tasks must only be carried out by gas specialists.
● Use only genuine accessories and spare parts.
● We recommend negotiating a service contract with Customer Service.
46 / 48
Screwdriver
Connection nipple
Check the gas connection pressure
. Close the customer gas tap.
. Loosen the screw plug in the connection nipple
with a screwdriver.
. Connect the gauge to the connection nipple.
. Open the customer gas tap.
. Ignite the gas burner.
. Check that the main flame is burning.
. Read the gas connection pressure.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis