Herunterladen Inhalt Inhalt Diese Seite drucken

Legacy Whirlpool INT Enterprise SE Handbuch Seite 45

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ELECTRICAL REQUIREMENTS
MS6013XE Hook-Up
Optional 2: 3-Phase Service, TN and TT Electrical Systems 5 Wires (3 Lines + 1 Neutral + 1
Protective Earth)*. Protective Earth wire (Green/Yellow) must be connected to system ground
terminal as marked.
IMPORTANT: Each service MUST include a neutral wire, with a line to neutral voltage
of 230VAC.
The heater runs on service line L1. All main-board equipment runs on service line L3.
Additional equipment, such as expansion boards, run on service line L2.
Completely remove the black wires from Section 1, J51 & J52 to Section 3, J88 & J62. If an expan-
sion board is installed, black wire must connect J53 and white to J1. Move black wires from section
3 at J12 & J36 to section 4 at J45 & J79. Heat Disable dip switches must be evaluated to prevent
the spa maximum ampacity from exceeding the service maximum ampacity (L1, L2, L3).
Brown L1
Blue N
Brown L2
Brown L3
Ground
* Must be sized to spa specification. Spa rated maximum ampacity cannot exceed the service
maximum ampacity. This does not represent an option to the Installer.
NOTE: Actual wiring of RCD will vary by manufacturer of RCD. Improper wiring of RCD
may result in permanent damage to spa control pack. Repair / replacement of spa system
box is not covered under warranty when damage results from improper wiring. Actual
wire attachment points on the Spa Control Pack may vary. Always refer to the wiring
diagram inside the Spa Control Pack for proper power connection.
DO NOT DIVE.
DO NOT DIVE.
1
2
3
4
43
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Int inspire se

Inhaltsverzeichnis