Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions - Legacy Whirlpool INT Enterprise SE Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION INSTRUCTIONS

1.
Put spa in final position that allows for access to equipment and spa components. Master
Spas recommends that at least 3 feet of space be provided around all sides of the spa for
access. This provides adequate space for regular maintenance and service.
2.
Remove front skirt panel (this is the side where the topside control panel is located) so
electrical can be hooked up to the spa control system. This panel is removed by unscrewing
the screws securing the skirt corners and the front skirt panel.
3.
With the front skirt panels removed allowing access to the equipment, be sure all pump and
heater unions are secure. Each pump has 2 unions and the heater has 2 unions. A newly
delivered spa may have loose unions caused in transporting the spa. Check that all slice valves
are open, in the up position. The slice valves may become closed during transportation of the
spa.
Slice Valve
and Pump Union
4.
Fill spa at least 1" above the filters or to the minimum water level indication located near the
filter area. We recommend filling the spa through the filter area.
5.
Turn the power on to the spa. Spa will initially display Priming Mode or "Pr". This lasts
approximately 5-6 minutes. This time is provided to allow each of the pumps to be activated
and checked to ensure they are not air locked from the spa being filled.
6.
Be sure the adjustable jets in your spa are open by turning the face of the jet. Most of the jets
in your spa are adjustable and removable by turning the face of the jet.
DO NOT DIVE.
DO NOT DIVE.
100
16

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Int inspire se

Inhaltsverzeichnis