ACCEPTANCE/MAINTENANCE REPORT
MASTER REPORT
REHAU VACUCLEAN Central Vacuum Cleaner System
Acceptance report ■
Maintenance report ■
1. System Specifications
Operator's name:
Address:
Central vacuum unit tpye:
Unit number:
Unit installed on:
2. Unit Inspection and Maintenance
Warning! Mortal Danger!
Components carrying power may cause death, mortal
peril and severe burns due to electric shock.
- Prior to beginning any maintenance tasks always
turn the central vacuum unit of and unplug the
power cord.
- Always use only a dry, clean cloth to wipe down
the central vacuum unit.
- When performing maintenance work, always
comply with the most recent Technical Information
and accident prevention regulations, the VDE
instructions and those of the Employer's Liability
Insurance Association.
- Inspect the equipment in accordance with the
following checklists.
- Correct any detected faults and record the correc-
tion under item 3.
- After each inspection has been completed and the
unit is operating faultlessly, place a checkmark in
the associated box.
38
ZIP Code / city:
■ 2000
■ 3000
Central Vacuum Cleaner System Checklist
■
■ Suction hose CC functional check
■ Functional check for radio control operation
■ Inspection and maintenance of the vacuum
■ Inspection and cleaning of the cardridge filter
■ Inspection and possibly emptying the waste
Suction Socket Checklist
■
■ Completely close the suction socket cover
■ Make sure the seal is operational
Suction Hose Checklist
■
3. Detected and corrected faults:
Maintenance performed on:
Company stamp/Customer service technical signature
■ 4000
Device switch functional check
Always unplug the central vacuum unit's main
power plug prior to performing the following steps
motor's carbon brushes
container
Remove any residue from the suction socket
Make sure there are no tears in the suction hose.