Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking; Inverter Type Label; Installation Sequence - SMA SUNNY TRIPOWER 60 Installationsanleitung

Vorschau ausblenden Andere Handbücher für SUNNY TRIPOWER 60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 47
SMA Solar Technology AG / SMA Solar Technology America LLC
Abbreviation Description
DNO
Distribution Network Operator

1.3 Unpacking

Contents:
• Inverter
• Wall mounting bracket
• Accessories bag containing:
– 6 wall plugs 8 x 50 mm
– 6 mounting screws 6 x 60 mm
– 1 M25 cable gland with sealing grommet for
Ethernet cables
– 1 grounding bolt M6 x 12 mm
– For STP 60-10-US additionally included:
2 x cable channel with conduit bracket (2")
• Installation manual
• Quick reference guide for installation

1.4 Inverter Type Label

The type label uniquely identifies the inverter. You will
require the information on the type label to use the product
safely and when seeking customer support from the
SMA Service Line. You will find the following information on
the type label:
• Device type (Model)
• Serial number (Serial No.)
• Date of manufacture
• Device-specific characteristics
Installation Guide

1.5 Installation Sequence

1. Pay special attention to the important safety
information at the beginning of this manual.
2. Mount the inverter according to Section 2.1, page 19,
Section 2.2, page 20, Section 2.3, page 21.
3. Open the inverter in accordance with Section 2.5,
page 22.
4. Install the AC supply in accordance with Section 2.6,
page 23.
5. Install Ethernet in accordance with Section 5.8,
page 42.
6. Install the PV module in accordance with Section 2.9,
page 25 using a PV array junction box.
7. Close the inverter in accordance with Section 2.5,
page 22.
8. Turn on AC.
9. Finalize commissioning by using the Local
Commissioning and Service Tool (LCS Tool). The tool is
available from the download area at
www.SMA-Solar.com. The hardware requirements for
the LCS tool are:
– PC with Windows
– 1 GB HDD
– 2 GB RAM
The LCS tool must be installed on a local PC drive.
The PC must be connected to the system network of the
SMA Inverter Manager. For setup via the LCS tool,
refer to Section 3.2.1, page 28.
10. Switch on the PV system via the PV load-break switch.
11. Verify the installation by:
– Inverter display: LED "On" is permanently green.
– LCS tool: In the inverter view, the status is "On
grid".
12. The inverter is in operation now.
1  Introduction
TM
7 and later
STP60-10-IA-xx-11
19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis