Operation
6.3

Laying pipes on a slope

When laying concrete pipes on a slope, the red
side of the pipe must always point downhill.
If the side marked in red points uphill, the
subsequent opening of the device is very difficult
or possibly not possible at all when setting
down the material to be picked up!
6.4

Before the daily work

Check that the leg springs are hooked into the SAFELOCK safety interlock and are intact.
Check for foreign bodies (dirt, stones) in the area of the internal gear teeth.
6.5

Operating procedure

The gripping good (concrete pipe) must always be
gripped below the largest pipe diameter.
Otherwise there is a danger of the load slipping!
DANGER OF LIFE!
54500005
Optimum pulling direction for opening the
device: