Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Siting; Opening The Appliance; Hydraulic Connection - STIEBEL ELTRON HSBB 3 S Bedienung Und Installation

Vorschau ausblenden Andere Handbücher für HSBB 3 S:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

INSTALLATION

Installation
11. Installation

11.1 Siting

1 Transport tube (on the installation side)
2 Transport aids
3 Appliance foot
4 Sliding block
f Undo the four screws from the non-returnable pallet.
f
f Remove the washers.
f
f Remove the appliance feet from the pack.
f
f Tilt the appliance and wind in the appliance feet.
f
f Lift the appliance off the pallet.
f
f You may need to use the sliding blocks provided to help you
f
position the appliance.
f Observe minimum clearances (see chapter "Preparations /
f
Minimum clearances").
f Remove the transport aids.
f
f Level the appliance horizontally using its adjustable feet.
f
www.stiebel-eltron.com

11.2 Opening the appliance

1
2
f Undo the fixing screws on the top appliance door.
f
f Open the top appliance door.
f
3
4
f Undo and remove the fixing screws from the lower appliance
f
door.
f Remove the lower appliance door.
f

11.3 Hydraulic connection

Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
Material losses
!
The heating system to which the appliance is connected
must be installed by a qualified contractor in accordance
with the water installation drawings that are part of the
technical guides.
Material losses
!
When fitting additional shut-off devices, install a further
safety valve in an accessible location on the heat gen-
erator itself or in the flow line in close proximity to the
heat generator.
There must be no shut-off device between the heat gen-
erator and the safety valve.
f Install the DHW outlet line and the cold water supply line
f
(see chapter "Specification / Dimensions and connections").
f Please note that, depending on the supply pressure, you may
f
also need a pressure reducing valve.
f Debris (e.g. welding pearls, rust, sand, sealant, etc.) can im-
f
pair the operational reliability of the heat pump.
Thoroughly flush the pipework before connecting the heat
pump.
f Ensure the heating flow and return are connected correctly
f
(see chapter "Specification / Dimensions and connections").
HSBB 3 |
31

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hsbb 3

Inhaltsverzeichnis