06
Commissioning for the use of PV surplus is now completed
With the last step, the commissioning for surplus use is completed. Additional functions,
such as the optional boost backup setting, must be set separately. For details, see the
operating instructions mentioned at the end.
Questions about technology | Questions about
commissioning | Questions about unit malfunctions
FAQs
Status icons (top right of home screen)
Lights up = set temperature reached
Flashes = stand-by, waits for excess
Lights up = heats with PV excess.
Flashes = boost backup mode
Lights up = no control signal
Operation
manual
The status shows „Heating finished", but the target
temperature has not yet been reached.
The immersion heater (3 kW / 9 kW) does not emit heat.
When controlling with „Modbus TCP", the specified
output is not delivered.
The boost backup is not carried out according to the set
time frames.
...
The answers to these and other questions can be found here:
https://my-pv.com/en/info/faqs-help/
In addition to this short manual, a comprehensive operating manual is
available under this link:
acthor-9s/
It may be necessary to update the firmware for operation. The procedure is
explained in the above-mentioned operation manual.
Commissioning takes place in a few steps and must be carried out when
starting the AC•THOR or AC•THOR 9s for the first time or after resetting to
factory settings. The settings made can be changed at any time afterwards.
Lights up = physical connection to the
RJ45 network connection is intact
Lights up = no intact physical connection
to the RJ45 network connection
Block active
https://www.my-pv.com/en/manuals/acthor-