Herunterladen Diese Seite drucken

Swing BOULDER Montageanleitung Seite 8

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 22
Installation instructions
3. Mains Connection
- Connect the mains supply 220-240V to the terminal block in accordance with the markings.
4. Mains Connection with remote control (Remote kit sold separately)
- Connect the mains supply 220-240V to the terminal block in accordance with the markings.
Fan Installation Instructions | Version 1.25
8
SWING Boulder

Werbung

loading