6.3

6.3 Electrical Connection

A standard 3-core cable is used to connect the heat pump to the
power supply.
The power supply and the control line are normally installed in
the ground (in ductwork with a suitable size and resistance) and
routed from the heat pump to the building. In order to meet the
relevant requirements, this ductwork must extend into the heat
pump by approximately 20 mm and be installed with a continu-
ous downward slope. Instead of 90° bends, two 45° bends must
be used as pipe bends. The control line and the cable for the
power supply are drawn into this ductwork.
The cable (power supply) must be provided by the customer. The
conductor cross section is selected in accordance with the power
consumption of the heat pump (see Appendix Device Informa-
tion) and the applicable VDE (EN) and VNB regulations.
The power supply line on the heat pump must be fed through the
provided cable feedthrough into the switch box. The line must be
firmly screwed to its feedthrough (vapour sealed pipe union).
An all-pole disconnecting device with a contact gap of at least 3
mm (e.g. a utility blocking contactor or power contactor) and a 1-
pole circuit breaker (tripping current in compliance with the de-
vice information) must be installed in the power supply for the
heat pump.
The control voltage is supplied via the heat pump manager.
The heat pump manager has a 230 V AC-50 Hz power supply.
Connect the controller in compliance with its own operating in-
structions (See heat pump manager instructions for fuse protec-
tion).
The control line (not included in scope of supply) is connected to
the heat pump manager using the two rectangular plug connec-
tors. Use the plug connector located on the base of the heat
pump adjacent to the cable gland in the base plate. More de-
tailed information can be found in the operating instructions of
the heat pump manager.
For detailed information, see Circuit Diagrams in the Appendix.
7

Start-up

7.1 General

To ensure that start-up is performed correctly, it should only be
carried out by an after-sales service technician authorised by the
manufacturer. This may be a condition for extending the guaran-
tee. (see warranty service)

7.2 Preparation

The following items need to be checked prior to start-up:
The heat pump must be fully connected, as described in
Chapter 6.
All valves that could impair the proper flow of the heating
water in the heating circuit must be open.
The air intake and air outlet paths must be clear.
The ventilator must turn in the direction indicated by the ar-
row.
The settings of the heat pump manager must be adapted to
the heating system in accordance with the controller's oper-
ating instructions.
Ensure the condensate outflow functions.
EN-6

7.3 Procedure

The heat pump is started up via the heat pump manager. Adjust-
ments should be made in compliance with the instructions.
If an overflow valve is fitted to maintain the minimum heat-
ing water flow rate, the valve must be adapted to the require-
ments of the heating system. Incorrect adjustment can lead to
faulty operation and increased energy consumption. We recom-
mend carrying out the following procedure to correctly adjust the
overflow valve:
Close all of the heating circuits that may also be closed during
operation (depending on the type of heat pump usage) so that
the most unfavorable operating state - with respect to the water
flow rate - is achieved. This normally means the heating circuits
of the rooms on the south and west sides of the building. At least
one heating circuit must remain open (e.g. bathroom).
The overflow valve should be opened far enough to produce the
maximum temperature spread between the heating flow and re-
turn flow listed in the following table for the current heat source
temperature. The temperature spread should be measured as
close as possible to the heat pump. The heating element of mono
energy systems should be disconnected during start up.
Heat source
temperature
between heating flow and return
From
To
-20 °C
-15 °C
-14 °C
-10 °C
-9 °C
-5 °C
-4 °C
0 °C
1 °C
5 °C
6 °C
10 °C
11 °C
15 °C
16 °C
20 °C
21 °C
25 °C
26 °C
30 °C
31 °C
35 °C
At hot water temperatures under 7° C, start-up is not possible.
The water in the buffer tank must be heated to a minimum
of 18 °C with the second heat generator.
To ensure a problem-free start-up, the following procedure is to
be implemented:
1)
Close all consumer circuits.
2)
Ensure that the heat pump has the correct water flow.
3)
Use the manager to select the automatic operating mode.
4)
In the special functions menu, start the "Start-up" program.
5)
Wait until a return temperature of at least 25 °C has been
reached.
6)
Now slowly reopen the heating circuit valves in succession
so that the heating water flow is constantly raised by slightly
opening the respective heating circuit. The heating water
temperature in the buffer tank must not be allowed to drop
below 20°C during this process. This ensures that the heat
pump can be defrosted at any time.
7)
When all heat circuits are fully open and a return tempera-
ture of at least 18° C is maintained, the heat pump start-up
is complete.
Max. temperature spread
flow
4 K
5 K
6 K
7 K
8 K
9 K
10 K
11 K
12 K
13 K
14 K