Herunterladen Diese Seite drucken

Sungrow SG 110CX Schnelle Installationsanleitung Seite 11

Vorschau ausblenden Andere Handbücher für SG 110CX:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Commission
Inspection
No.
All equipment has been reliably installed
DC and AC switches are in the "OFF" position.
2
3
The ground cable is properly and reliably connected.
The AC cable is properly and reliably connected
4
The DC cable is properly and reliably connected
5
The communication
6
The vacant
terminals
7
No foreign items, such as tools, are left on the top of the machine or in the
8
junction box (if there is)
The AC circuit breaker is selected in accordance
9
manual
and
local
All warning signs & labels are intact and legible.
COmmissioning
Stepl
Rotate the DC switch to the " ON " position.
Step2
Connect the AC switch between the inverter and the grid.
Step3
Connect
the DC switch
Step4
Set initial protection parameters via the iSolarCloud APP. If the irradiation and grid conditions meet
requirements,
the inverter will normally operate.
Step5
Observe the LED indicator to ensure that the inverter operates normally.
LED indicator
description
before Commissioning
Items
cable is properly and reliably connected.
are
sealed.
standards.
Procedure
(if applicable)
Steady blue
Periodical flashing blue
(Period: 0.2s)
Periodical flashing blue
(period: 2s)
Steady red
Flashing red
OFF
with the requirements
between
the inverter and the PV string.
The device is connected
The
Bluetooth
communication
data
communication.
The DC or AC side is powered
standby or startup state (not feeding power into the grid)
A fault occurs and the device cannot connect
The Bluetooth
communication
data
communication.
Both the AC and DC sides are powered down,
Result
Yes
of this
to the grid and operating
is connected
and
NO inverter
fault
occurs.
on and the device is in
is connected
and there
Fault
occurs
No
normally
there
is
to the grid
is

Werbung

loading

Diese Anleitung auch für:

Sg 110cx-20