Herunterladen Inhalt Inhalt Diese Seite drucken

Allocating The Connection Cable For The Panel - G&D FIBREVision-MC4-ARU Installation Und Betrieb

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Allocating the connection cable for the panel

The connection cable, which is provided in the scope of delivery has to be fixed to the
panel. The following figure illustrates how the pins are assigned to the panel's functions:
I1 SW1_ATXPWR# (Pin 1)
I2 SW2_RESET# (Pin 3)
1 2 3 4
Figure 10: Pin assignment to the functions of the panel
To switch one of the ATX-Power or Reset signals, the signal has to be conductively
connected to the shared minus contact (pin 4):
I1 SW1_ATXPWR# (Pin 1)
I2 SW2_RESET# (Pin 3)
- 0V (Pin 4)
Figure 11: Basic circuit with buttons for ATX-Power and Reset
- 0V (Pin 4)
The FIBRE-Power expansion
G&D FIBREVision · 55

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis