Herunterladen Diese Seite drucken

AWG S2/M2 Originalbetriebsanleitung Seite 38

Umschaltbare schaumrohre
Vorschau ausblenden Andere Handbücher für S2/M2:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

AWG | Fittings | Adjustable foam nozzles S2 / M2 and S4 / M4
Replacing the pressure gauge
1. Use a spanner A/F 14 to unscrew the pressure gauge (Fig. 3/4) from
the nozzle body.
2. Clean the female thread on the nozzle body.
3. Position the new pressure gauge on the shut-off valve and carefully
tighten until you feel a slight increase in torque.
Any repair work on the AWG Foam nozzles may only be performed by
the AWG Fittings GmbH customer service or by an authorised specialist
workshop.
If you need technical support, please contact our Service Centre:
AWG Fittings GmbH
Service Centre
D-89177 Ballendorf
Telephone: +49 (0) 73 40 / 91 88 98 880
Email: awg-service@idexcorp.com
We will accept devices in need of repair or maintenance, discuss with you
the quickest and cheapest solution, create cost estimates, take care of the
execution of the repair work and are at your disposal for any questions.
7 .3
Disposal
Observe the local regulations regarding proper waste recycling or disposal.
Materials
Foam tube, conversion screen: Stainless steel
Nozzle body, stop valve:
Seals:
Protection ring:
M1108B10 | Rev. 03-08/24
Aluminium
NBR
NBR
MAiNTENANCE
38

Werbung

loading

Verwandte Produkte für AWG S2/M2

Diese Anleitung auch für:

S4/m4