Herunterladen Diese Seite drucken

Transport; Installation; General; Sound - Dimplex Hwk 332 Montage- Und Gebrauchsanweisung

Hydro-tower ohne wpm; hydro-tower mit wpm
Vorschau ausblenden Andere Handbücher für HWK 332:
Verfügbare Sprachen

Verfügbare Sprachen

HWK 332 - HWK 332 Econ5P
5

Transport

A pallet should be used to transport the heat pump to its final in-
stallation location. The basic device can be transported with a lift
truck, a pushcart or similar.
ATTENTION!
The hydro tower is to be fixed to the transport pallet with screws.
6

Installation

6.1 General

The unit should always be installed indoors on a level, smooth
and horizontal surface. The hydro tower must be installed in such
a way that maintenance work can be carried out from the operat-
ing side without hindrance. This can be ensured by maintaining a
clearance of 1 m at the front. The space required (approx. 30
cm, see dimension drawing) for replacing the protective anode
must be taken into consideration when determining the required
height of the installation room. It must be installed in a room pro-
tected from frost and with short pipe runs.
Setup and installation must be performed by an authorised spe-
cialist company.
If the hydro tower is installed on an upper floor, the load-bearing
capacity of the ceiling should be checked. On account of the
acoustics, measures for isolating possible vibrations should also
be very carefully planned. Installation on floors above wooden
ceilings is not recommended.

6.2 Sound

To prevent solid-borne sound from being transmitted to the heat-
ing system, we recommend connecting the heat pump circuit to
the hydro tower using a flexible hose.
452162.66.05 · FD 9701
English
EN-5

Quicklinks ausblenden:

loading

Diese Anleitung auch für:

Hwk 332 econ5p