Herunterladen Diese Seite drucken

AWG Z2 Originalbetriebsanleitung Seite 36

Vorschau ausblenden Andere Handbücher für Z2:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

AWG | Fittings | Inductors Z2, Z4 and Z8
6
Functional test
6 .1
Prerequisites
All testing of the AWG Inductors Z2, Z4 and Z8 must be carried out in
accordance with the manufacturer's technical documentation and must
be documented if necessary.
The following inspections are defined for the inductors:
– Mandatory BASIC Inspection after each use
– Mandatory STANDARD Inspection every 12 months
– Optional ADVANCED Inspection every 12 months
The STANDARD and ADVANCED inspections may only be carried out by
qualified personnel who have been trained for these inspections:
– Firefighters who have received training as firefighting equipment
maintenance technicians or persons with equivalent qualifications
– Or, if desired, directly by the manufacturer
Inspection by the manufacturer
AWG Fittings GmbH offers an inspection as part of its service offering.
Send us your inductor and you will receive the inspected device back by
the agreed date. You will find a return delivery form on our website www.
awg-fittings.com. If required, a rental device can also be provided.
M1061B10 | Rev. 03-08/24
Documenting the inspection result
To meet the requirements for occupational safety and acci-
dent prevention, the test results for each test must be docu-
mented. Please observe the country-specific regulations.
In Germany, the guidelines of the DGUV (Deutsche
Gesetzliche Unfallversicherung e.V. [German Statutory
Accident Insurance]) apply. A product specific test chart
in accordance with the DGUV can be downloaded from
www.awg-fittings.com
– Keep the documented test result as proof.
functional tESt
36

Werbung

loading

Diese Anleitung auch für:

Z4Z8