Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - Honeywell BA295 Compact Einbauanleitung

Systemtrenner backflow preventer
Vorschau ausblenden Andere Handbücher für BA295 Compact:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.2 Assembly instructions
1. Thoroughly flush pipework
2. Install backflow preventer
• Install in horizontal pipework with discharge connec-
tion directed downwards
• Note flow direction (indicated by arrow)
o Install without tension or bending stresses
• Provide a straight section of pipework of at least five
times the nominal valve size after the backflow
preventer
3. Attach drain pipe to discharge connection (plastic
pipe HT 50)
4. The appliance is ready for use

8. Maintenance

We recommend a planned maintenance
contract with an installation company
Maintenance of backflow preventer must be
carried out by authorized personnel!
8.1 Inspection
• Frequency: every 6 month (depending on
local operating conditions)
• To be carried out by an installation company
• Inspection with a test control unit and mainte-
nance-set (see accessories)
8.1.1 Testing discharge valve
Take note of the instructions of the test control
unit TKA295 or TK295
1. Procedure according to instruction of the test control
unit TKA295 resp. TK295
Quick test for the discharge valve:
• Lower the inlet pressure
o if the discharge valve opens (it drops), the
function is o.k.
8.1.2 Testing outlet check valve
Take note of the instructions of the test control
unit TKA295 or TK295
1. Procedure according to instruction of the test control
unit TKA295 resp. TK295
Honeywell GmbH
GB
8.2 Maintenance
We recommend a planned maintenance
contract with an installation company
In accordance with DIN EN 1717 a regular mainte-
nance must be taken.
Frequency: every 1-3 years (depending on local
operating conditions)
To be carried out by an installation company
8.2.1 Cartridge insert
1. Close shutoff valve on inlet
2. Release pressure on outlet side (e.g. through water
tap)
3. Close shut off valve on outlet
4. Remove cover
5. Replace cartridge insert and lip seal
• Don't disassemble cartridge insert to indivi-
dual parts!
6. Reassemble in reverse order
o push down the cartridge insert till it snaps in
7. Test function (see chapter inspection)
8.2.2 Check valve
1. Close shutoff valve on inlet
2. Release pressure on outlet side (e.g. through water
tap)
3. Close shut off valve on outlet
4. Remove cover
5. Exchange check valve
6. Test function (see chapter inspection)
7
MU1H-1224GE23 R1112

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis