Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Maintenance; Disposal - Honeywell RV283 Einbauanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The valve is available in the following sizes: DN200, DN250 and DN300.
• standard
- not available
Connection type:
With drilled flanges, PN16, ISO 7005-2, EN 1092-2, EPDM lip seal
ring
Note:
... = space holder for connection size
Note:
Ordering number example for DN200: RV283P-200A
6

Assembly

6.1 Installation Guidelines
Install in horizontal pipework with test and drain plug
downwards
This position is best for draining
Install shut-off valves
Shut-off valves provide optimal serviceability
Ensure good access
Simplifies maintenance and inspection
Install right after water meter if applicable
Protects against backflow from water systems
6.2 Assembly instructions
1.
Thoroughly flush pipework
2.
Close shut-off valve on inlet
3.
Release pressure on outlet side (e.g. through water tap)
4.
Close shut-off valve on outlet
5.
Fit check valve for example between water meter and
pressure reducing valve, filter or filter combination
Note flow direction
Install without tension or bending stresses
6.
Slowly open shut-off valves on inlet and outlet
7

Maintenance

CAUTION!
In accordance with DIN EN 806-5, the following
operations should be carried out regularly. A
planned maintenance scheme is recommended.
7.1 Inspection
7.1.1Check valve
CAUTION!
Interval: once a year
1.
Close shut-off valve on outlet
2.
Open test valve
Until the pressure is released, some water will
flow out of the test valve. After a short period of
time the water flow should stop. If the water
continues to drip or run, then the check valve
must be replaced - see servicing of check valve
3.
Close test valve again
4.
Slowly open shut-off valve on inlet
Honeywell GmbH
GB
7.2 Maintenance
7.2.1Check valve
To be carried out by an installation company
1.
Close shut-off valve on inlet
2.
Release pressure on outlet side (e.g. through water tap)
3.
Close shut-off valve on outlet
4.
Replace check valve
5.
Slowly open shut-off valves on inlet and outlet
8

Disposal

See Chapter 4 Scope of Delivery
Observe the local requirements regarding correct
waste recycling/disposal!
6
RV283P-...A
MU0H-1265 GE23 R0818

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis