Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

is thoroughly flushed before the machine is con-
nected. It is necessary to remove all foreign de-
bris from the water supply line so that they do
not cause any damage to machine components.
- For service purposes it is recommended to in-
stall in the water supply line a shut-off valve
before the connection to the machine.
- The water supply line must be at least 2 bar
pressure at a temperature between 6 and 25° C.
- Connect one end of the water supply hose
(included with the machine) to the water sole-
noid valve of the machine. It is here that the
pressure reducing valve should be fitted if re-
quired. Connect the other end to the water supply
line connection).
Drain line
- All appliances are equipped with a flexible
drain hose.
- Check that there are no bends or constructions
along the entire lengths of the filling and dis-
charge pipes.
Models with Drain Pump
- Models supplied with a drain pump are capable
of pumping waste water from ground level of
the machine up to a maximum height of 700mm
above the base of the machine
Models with Gravity Waste
- The waste hose must be installed according
to the technical index refering to the machine
type.
Plumbing check
- After all connections to the water supply line
and drain system have been made, check for
any leaks, kinks or obstructions.

Electrical Connection

- All electrical work must be carried out by a
competent qualified engineer.
- Electrical and grounding connections must
comply with applicable state and local regula-
tions.
- Please refer to the machine data plate for the
machine voltage, frequency, phase and total
amperage load specifications. The machine
data plate is located on the bottom right-hand
side of the machine.
30

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Eco 400 apEco 500Eco 500 apEco 1000

Inhaltsverzeichnis