PR 5710 Additional Information
1.4.5 Battery activation
The unit is delivered with the battery not connected. The battery must be connected, follow the safety hints. The
jumper for the battery is located on board 2 next to the 4-pole power supply cable.
The jumper must provide the connection between the posts to activate the battery.
After the battery has been activated, the clock (data and time) needs adjustment.
There are different possibilities for monitoring the battery voltage during operation. One is that during startup,
a low-battery sign will be displayed on the weight indicator:
1.4.6 Battery replacement
Disposal
1.5
Cleaning
1.6
If necessary, the front panel can be cleaned using a damp, soft cloth. Use only little water or isopropyl alcohol
for moisturizing. No moisture must enter the instrument inside.
6
The PR 5710 contains a lithium battery for memory back-up (saving the data). When
exceeding the specified minimum battery voltage, or in case of defect, the battery
must be replaced by the Sartorius customer service or by an equivalent trained person
and disposed of in accordance with the local regulations.
Electronics scrap is special waste.
Please, follow the instructions of your local disposal company.
X6 System Weighing Controller
Sartorius