Herunterladen Diese Seite drucken

STIEBEL ELTRON MAE-K Bedienung Und Installation Seite 26

Vorschau ausblenden Andere Handbücher für MAE-K:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION
Water connection
f Screw the short threaded section of the threaded rod into the
tap from below.
Property damage
!
f Tighten the connection hoses until finger-tight only.
Do not use pliers or a spanner.
f Ensure that the hoses are not twisted or under ten-
sion.
f Screw connection hoses A, B and C until finger-tight into the
corresponding threaded holes on the tap from below. Ob-
serve the markings on the tap and hose.
f Insert the tap with seal ring into the hole.
f Secure the tap onto the threaded rod from below with the
triangular support brace, U-shaped pressure washer and
hexagon nut.
f Screw the spout to the tap body.
26
| MAE-K | MAE-W | WST-W
7.
Water connection
Notice
Ensure that the connection hoses are not kinked, twisted,
interchanged or put under tension during the assembly
process.
f Connect the short blue-marked connection hoseto the angle
valve on the cold water supply line.
f Using an open-ended spanner to counterhold the connection
on the hot water boiler, connect the long blue-marked con-
nection hose to the cold water inlet connection on the hot
water boiler.
www.stiebel-eltron.com

Werbung

loading

Diese Anleitung auch für:

Mae-wWst-w