Herunterladen Diese Seite drucken

KRAUSE ProTec XS ECO Aufbau- Und Verwendungsanleitung Seite 14

Fahrgerüst (fahrbare arbeitsbühne)

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
ProTec
XS ECO
®
Visually inspect the tower to make sure that all of the welds and other materials are free from cracks, and that none of the
parts are bent or dented. Make sure that parts such as locks, spindles, castors etc. are in proper working order.
The following components always have to be checked every time before assembling the tower:
– Vertical frame: For deformation, crushing and cracking
– Railing struts: For deformation, crushing, cracking and the function of the securing device
– Working platforms: check for deformation, dents, cracks and whether the locks work
– Hatch: make sure hatch works
– Toe boards: condition of wood, cracks
– Swivel castors: Rolling ability of the castor and the function of the brake.
– Fail-safe device (gravity pin, bolt with nut) Check on vertical frame or castor
– In adjustable castors, check the spindles' ease of movement. Check safety locks (locking pins) on the vertical frame and
base sections with castors
– Retainers: check for deformation, dents, cracks and secure fit
– The tower's components have to be stored in such a way that they cannot become damaged.
– The individual parts have to be stored lying down and protected from weather.
– Components have to be positioned and protected in such a way during transport that they cannot become damaged.
– The tower components can be cleaned using water and conventional cleaning agents. Any paints spilled on the
components can be removed with white spirit.
14

Werbung

loading

Diese Anleitung auch für:

949967