– The tower must only be moved longitudinally or diagonally.
– The surface on which the mobile scaffold tower is being moved has to be capable of bearing the tower's weight.
– It is prohibited to raise or attach the mobile scaffold tower to another object or device.
– The mobile scaffold tower must only be moved up to wind force 6 (~ 45 km/h) wind speeds.
– The castors must always be arrested before ascending the tower.
3.4 Checking the site of use before assembly, after moving or changing the mobile
scaffold tower's configuration
The following points must always be checked before every use of the mobile scaffold tower:
– The mobile scaffold tower always has to be vertical relative to the ground. Where necessary, it may have to be
realigned to ensure the same.
– All of the tower's component must be fitted as set out in the Assembly Instructions and User Manual.
– Ballast weights are installed in accordance with the assembly instructions and instructions for use.
– The brakes on the castors have to be locked every time the tower has been moved.
– Make sure there are no electrical hazards.
– Make sure there are no changes in the environment that could pose a hazard to tower's safe use.
3.5 Required tools
– Two spanners 13 mm.
63
4. Assembly
4.1 General
The mobile scaffold (mobile working platform) may only be assembled once you have read the product information (Sec-
tion 2) and the safety regulations (Section 3) in full. One person is required for the installation and dismantling processes.
Only original components in accordance with the manufacturer's specifications may be used.
4.2 Attaching ballast to the mobile scaffold tower
The ProTec
XS ECO must be fitted with ballast weights when used outdoors. See the ballast table on page 71.
®
4.3 After assembly or modification of the mobile scaffold tower's configuration
The tower has to be fitted with a sign that is visible from the ground and contains the following minimum information:
– Name and contact details of the person in charge of the site
– Whether or not the mobile scaffold tower is ready for use or not
– The load class and maximum distributed load
– Whether the mobile scaffold tower is only designed for use in closed indoor spaces
– The date the tower was erected
5. Disassembling the mobile scaffold tower
To dismantle the ProTec
XS ECO, follow the assembly instructions in reverse order.
®
6. Inspection, care and maintenance
All of the tower's parts must be checked for damage before setting it up and any damaged parts must be replaced.
Damaged parts must only be repaired by the manufacturer. Only use original spare parts.