Herunterladen Diese Seite drucken

Panasonic CQ-858EG Serviceanleitung Seite 44

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

-CO-858EG
6. M.G
PLATE
ASS'Y
INSTALLATION
1) Pass bosses
D1
and
D2
of the M.G
Plate Ass'y 5)
through square holes D1' and
D2' of the Chassis Ass'y
(D1 — D1', D2 ~ D2'). (Fig. 6-1)'
2) Insert the boss of the Turn Over Gear @f) into the
hole of the Turn Over Gear Collar
which is placed
in the groove of the Change Plate Ass'y (206) . (Fig. 6-2a)
3) Engage
holes
E1 and
E2 of the M.G
Plate Ass'y with
studs
E1' and
E2'
of the Chassis Ass'y and slightly
press them down. (Fig. 6-1)
4) Rotate
the Main
Gear
(or the Motor
Pulley) so
that gears are engaged well.
5) Press
FF
and
REW
Levers
at
the
same
time
to
6) Install the T.G Actuator Qa). (Fig. 6-2}
7) Install the Main Plate (08). (Fig. 6-2)
Note:
After
installation, confirm the relation of posi-
tion F ~ Jin the Fig. 6-2b.
8) Install
the Control
Spring
Qi) . Insert it in between
the F.R Lock Plate (if) and the Chassis Ass'y. (Portion
K in the Fig. 6-3a).
9) Install
a F.R Actuator Qi). (Set one side in the groove
of the F.R Slide Plate (i). (Fig. 6-3b)
10) Install the Main Belt.
"se
fixsaground=of=the=T-S Actuator OM) swhensthe M6
=
Plate Ass'y is put back in its specified place, fix it with
two camera screws (293). (Fig. 6-1)
Screw
Chassis Ass'y
F.R Slide Plate
E.S Plate
Chassis Ass'y
Control Spring
(Fig. 6-3a)
Turn Over Gear Collar
|
H
i) Turn Over Gear
Change Plate Ass'y (208)
:
;
(Fig. 6-2a)
T.G Plate (F) Ass'y
Main Plate
T.G Plate (R)
Ass''y
Take Up Reel
Sub Ass'y
T.G Actuator
T.G Push Plate
(Fig, 6-2b)
Motor Pully
(Fig. 6-4)
Aye

Werbung

loading