MONDELIN LEVPANO I Bedienungs- Und Wartungsanleitung Seite 18

Vorschau ausblenden Andere Handbücher für LEVPANO I:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24
Now, load the plasterboard onto the arms, with the latter in the tilted position.
Bring the beam and the plasterboard back in the horizontal position, using the operating handle, and raise the
columns so as to put the plasterboard in place.
For horizontal fixing (or fixing on ceiling) and after bringing the assembly back in the horizontal position, it is
possible to unlock the beam so as to make it possible for the latter to pivot over approx. 90° around its tilting
axis.
This tilting of the beam enables the operator to adjust the positioning of the plasterboard at the ceiling.
5) Fixing under pitches
To fix boards under pitches, unlock the beam's base so as to
pivot it a quarter of a turn and then lock the beam in this new
position.
Operate the lever situated on the operating handle so as to tilt
the beam.
Verify that the feet at the front of the device are correctly
adjusted for fixing under pitches, making sure that the clips
pins are in position 1-2, otherwise adjust the feet.
Turn the arm extension ref. PR0285 (see page 1 or 3) so that
the metal stops are placed upwards to receive the plate.
Now, load the plasterboard onto the arms, with the latter in the
tilted position.
Raise the columns so as to bring the plasterboard's top in
contact with the "paddings" and then continue rotating the
winch's handle until the plasterboard is in its final position
under the "paddings" and fix the handle.
6) Vertical fixing (or on partition)
To fix boards vertically (or on partition), adjust the beam in
the same way as for fixing under pitches.
Operate the lever situated on the operating handle so as to tilt
the beam.
Adjust the two feet situated at the front of the device,
introducing the pins in position 3.
Rotate the arm extension, ref. PR0285 (see page 1 or 3), so
that the metal stops are upwards and can receive the
plasterboard.
Now, load the plasterboard onto the arms, with the latter in the
tilted position.
After moving the device close to the uprights on which the
plasterboard will be positioned, the operator shall operate the
lever situated on the operating handle so as to release the lock
from its location and thus make it possible for the beam and
the plasterboard to tilt into the vertical position for positioning
on the uprights. Continue rotating the winch's handle so as to
bring the plasterboard's top in contact with the ceiling.
Immobilize the LEVPANO
and then fix the plasterboard on the uprights.
Provide for sufficient space between the bottom of the
plasterboard and the floor in order to release the metal stops
from the arm after fixing the plasterboard.
7) Using the platforms of the LEVPANO
As specified in paragraph 1, the platforms supplied with the LEVPANO
panels in order to fix them on ceiling or under pitches.
When the platforms are used, they must be firmly fixed to the chassis, using the 4 screws and nuts.
by operating the wheel brakes
®
I
®
17
I can be used to fit plasterboard
®
3