Figure B1: General construction rules for post-installed rebars
Post-installed rebar may be designed for tension forces only.
The transfer of shear forces between new concrete and existing structure shall be designed additionally
according to EN 1992-1-1.
The joints for concreting must be roughened to at least such an extent that aggregate protrudes.
*)
If the clear distance between lapped bars exceeds 4·, then the lap length shall be increased by the
difference between the clear bar distance and 4·
c
concrete cover of post-installed rebar
c
concrete cover at end-face of existing rebar
1
c
minimum concrete cover according to Table B1 and to EN 1992-1-1
min
diameter of reinforcement bar
l
lap length, according to EN 1992-1-1 for static loading
0
embedment length ≥ l
l
v
d
nominal drill bit diameter
0
Injection system Hilti HIT-FP 700 R for rebar connections
Intended use
General construction rules for post-installed rebars
+ c
0
1
d
0
.
Page 8 of 22 | 1 7 / 0 6 / 2 0 2 2
8 mm ≤ ϕ ≤ 40 mm
Annex B2