Herunterladen Diese Seite drucken

Tecno-gaz STGA099 Bedienungsanleitung Seite 63

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 123
 
8.5
Starting the sterilization cycle
 
Choose sterilization program most adaptable of load prepared and press the button
B-SELECT.
Each individual pressure changes program selection to the next.
After having chosen the program start the cycle by pressing the button B-START, the door
will lock automatically and the cycle will begin.
During the cycle, the display will show all parameters and relative information.
8.6
End of cycle
 
An acoustic signal will warn the operators that the sterilization cycle has been completed
and the "END OF CYCLE " message will be displayed.
When the acoustic signal stops, release the door by pressing the
is pressure inside the chamber, the button will not activate the release device. Wait until the
chamber is completely depressurized, then repeat the operation or, in emergency situations
only, simultaneously press
handle to open it.
8.7
Unloading, preserving and storing the sterilizied materials
 
Wear personal protection equipment in accordance with the existing laws.
Extract the trays using the special spanner provided (FIG.10), and place the autoclave load
on a clean, dry surface Then store the treated instruments in the special, prepared
compartments.
8.8
Discharging used water
 
When the led of used water level (FIG.2–pos.
emptied, the autoclave function is inhibited.
Take the pipe provided (FIG.16), and insert it in the used water discharge plug, on the front
of the autoclave (FIG.2–pos.
complete turns), simultaneously place the other end of the pipe in a container, the water will
descend into the same container.
IMPORTANT
A - The hose located in the receiving container, must not ever, touch or be immersed in the
discharged water, otherwise there will be a situation of sucking up.
B - Always wait until the unloading water is totally emptied. The led of maximum used
water level will turn off when there is still water in the tank, therefore do not use as a
reference for this operation.
To the term of the drainage to screw the metal ring and remove the tube.
 
                                                                                                          
B-DOOR
+ B-PUMP. When the door is released, pull the door
14
), unscrew the metal ring anticlockwise (to execute 2
26
) goes on, proceed with emptying. If not
ENGLISH
B-DOOR
button. If there
21

Werbung

loading