Herunterladen Diese Seite drucken

Carrier XCT7 40VD048A-7S-QEE Handbuch Für Betrieb Und Installation Seite 11

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 85
Installation Procedures
The standard attached accessories of the units in this series refer to the packing; prepare other
accessories according to the requirements of the local installation point of our company.
1. Before installation [don't throw away the attached parts required for the installation]
Determine the route to move the unit to the installation site;
Don't tear the package open before moving the unit to the installation site. When unpacking,
soft material or protector block with ropes can be used to lift the unit to avoid damaging or
scraping the unit.
2. Select the installation site
(1) The installation site should be selected according to the following conditions, which should
be approved by users.
where ideal air distribution can be ensured; where there is no blockage in the air passage;
where condensed water can be drained out properly; where the surface strength can bear
the weight of the indoor unit;
where enough space can be ensured for maintenance. The outside air should be input
from the outdoor directly from the blast pipe. If the blast pipe can't be jointed, the air can't
be input from the suspended ceiling.
where the lengths of the piping between indoor and outdoor units are within the allowable
range (refer to Installation of Outdoor Units) where there is a distance of at least 1 m
between indoor units, outdoor units, mains supply, connecting wires and television or
radio to avoid image disturbance and noise from the above electrical appliances. (Even if
1 m can be ensured, a strong electric wave might cause noise disturbance.) Additionally,
equipment, television or other valuables can't be placed under the unit to avoid condensed
water from dripping onto these, causing damage.
(2) Height of Ceiling:
The ceiling should be located at a place where the central position of air outlet port is less
than 3m high above the ground.
(3) Hoisting studs should be used during installation.
Check if the surface can bear the weight of the unit. Reinforce it before installation if
necessary.
(4) The dimension of maintenance
Make sure that it is easy to demount the electrical control box, fan, monitor, and filter.
6

Werbung

loading

Diese Anleitung auch für:

Xct7 40vd072a-7s-qeeXct7 40vd096a-7s-qee