Herunterladen Inhalt Inhalt Diese Seite drucken

ATH-Heinl Single Lift 12PL Bedienungsanleitung Seite 103

1-säulen-hebebühne
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
The device was subjected to an inspection for operational readiness. No/the following* defects were found:
Scope of inspection: Functional and visual inspection according to specifications
Partial inspection still outstanding:
There are no *) objections to commissioning, subsequent testing is not *) required.
(place, date)
Confirmation of acceptance:
Operator (Company stamp, date, signature)
Defects noted **)
Deficiencies corrected **)
*) Please delete where not applicable
**) Confirmation of the operator or an authorized representative with date and signature
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
Visual inspection (authorized expert)
Inspection report
On a regular/extraordinary inspection/re-inspection*.
Release date: 02.05.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
(Signature of expert)
(Name of expert)
(Job title)
(Address)
(Employed by)
103

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis