TRANSPORTATION AND HANDLING

5 TRANSPORTATION AND HANDLING
1 Transport the air panel without unpacking as close to the
installation location.
2 Mount the air panel as soon as possible after unpacking.
3 When the air panel is placed on the floor after unpacking,
place it with the rear side downward (the surface to fit the
indoor unit body) on an insulation material, etc. However,
do not leave the air panel on the floor for long time. It may
cause air leakage due to scratch the seal packing.

6 BEFORE INSTALLATION

1 Check to ensure that the following accessories are packed with the air panel.
Name
Long Screw (M5 Cross Screw)
Receiver Kit PC-ALHC1
Timer
Filter
Def
Run
Emergency
Heat
Cool
Plastic band
Installation Manual and Operation Manual
If any of these accessories are not packed in the packing, please contact your contractor.
3
PMML0570 rev.0 - 01/2021
In addition, if the air panel is placed with the surface
downward, the louver mechanism may be damaged due to
touch the louver to the floor, etc.
4 Do not move the louver by hand. If moved, the louver
mechanism will be damaged.
Quantity
P-AP56NAM
P-AP56NAMS
4
4
-
-
-
-
1
1
P-AP56NAMR
-
For fixing air panel
1
With connecting cable
1
For fixing wiring cover and connecting cable
1
-
Remarks

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

P-ap56namsP-ap56namr

Inhaltsverzeichnis