8.4 Selecting the anchors
• Liebig anchor without floor cover (screed)
Safety anchor with threaded bolts and nuts
BM 10-15/70/40
• Liebig anchor with floor cover (screed)
Safety anchor with threaded bolts and nuts
BM 10-15/70/xx (length of the anchor depends on the
floor covering)
• Fischer anchor without floor cover (screed)
High quality anchor FH II-B (bolts and nuts)
FH II 15/50 B
• Hilti anchor without floor cover (screed)
Heavy duty anchor
HSL-3-G M10/40
• Hilti anchor without floor cover (screed)
Heavy duty anchor
Hilti HIT-V-5.8/M10/130
i
Similar value anchors and other known brands of
anchor manufacturers can be used when considering
the conditions.
8.5 Assembly
i
Follow the instructions enclosed in the anchor packag-
ing.
OPI_SPRINTER MOBIL 2500-3000_V4.0_DE-EN-FR-ES-IT
9
Safety inspection
The safety inspection is required to guarantee operational
safety of the lift. It is to be done.
1. Before first commissioning after setting up the lift
Use the "single safety inspection" form
2. After first commissioning, check regularly at least once
per year.
Use the "regular safety inspection" form
3. After changes to the lift construction.
Use the "extraordinary safety inspection" form
i
Single and regular safety inspections must be done by
a specialist. It is recommended to do maintenance at
the same time.
After a change in construction (for example chang-
i
ing the load carrying capacity or changing the lifting
height) and after significant maintenance on load car-
rying parts (e.g. welding work), inspection by a techni-
cal expert is required (extraordinary safety inspection).
This inspection book contains forms with a printed inspec-
tion plan for safety inspections. Please use the appropri-
ate form, record the condition of the inspected lift and
leave the completed form in this inspection book.
011
67