Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - VOLTCRAFT SEM5000 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für SEM5000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

TIME
COST
PERIOD
PM
ENERGY
CO
2
9

Operation

A Supercap condenser is integrated into the energy logger, which
is used to operate/program the device without having to plug it
into a mains socket (for around 10 minutes).
The capacitor is usually in an uncharged state upon delivery/
start-up. Therefore, the energy logger can only be operated/pro-
grammed when it is plugged directly into a mains socket upon
start-up.
You can unplug the energy logger from the mains socket and
program it, e.g. in sufficient light in the living room or office, only
when the capacitor is sufficiently charged (after around 50 min-
utes).
66
Operating time
Cost display
Automatic measurement process
Afternoon in 12h time mode
Energy (indicated in kWh = kilowatt hour)
CO
emissions (indicated in kg/kWh)
2
Power limit LOW STANDBY POWER LEVEL
Night mode
SD card
SD card full

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

2587314

Inhaltsverzeichnis