Herunterladen Inhalt Inhalt Diese Seite drucken

Maico PP 45 DFK Montageanleitung Seite 10

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 Installation
If the roof outlet duct is extended, this con-
nection joint should be fixed with adhesive
tape.
If required, the roof outlet duct can be ex-
tended using a second roof outlet duct.
2. Use appropriate material, provided by the cus-
tomer (film, adhesive tape), to correctly seal
the roof outlet duct to the roof cladding all
around.
Incorrectly performed installation can result
in leakage and consequential building dam-
age.
10
5.4 Installing roof covering frame
1. Cover roof tiles in bottom area.
2. Pull the PP 45 DER roof covering frame apart
and place it on the roof outlet duct.
3. Push the roof covering frame together to adapt
it to the roof pitch. The upper part of the roof
covering frame rests on the roof outlet duct,
while the lower part rests against the front.
DANGER Risk of injury when handling
covering frame.
When adjusting the covering frame, fingers can
be pinched and injured.
Wear protective gloves.
4. Use the horizontal attachments provided to se-
cure roof covering frame to available battens.
Another auxiliary construction (*) may be
needed on the ridge side to secure the roof
covering frame. Before fixing, shape the roof
covering frame in the lower area of the tile
support so that it rest cleanly on the roof bat-
tens.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis