Herunterladen Inhalt Inhalt Diese Seite drucken

Flush Mounting - Veratron VL FLEX 52MM Serie Bedienungsanleitung

Intelligent battery monitor kit
Vorschau ausblenden Andere Handbücher für VL FLEX 52MM Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

FLUSH MOUNTING

The recommended panel thickness is 1.5 to 3 mm. The drill hole must have a diameter of 48.1 mm. [A]
Ensure that the installation location is level and has no sharp edges.
Do not drill holes or ports in load-bearing or stabilizing stays or tie bars!
Note the necessary clearance behind the drill hole or port at the installation location. Required
mounting depth: 65 mm.
Drill small ports; enlarge and complete them, if necessary, using taper milling tools, saber saws, keyhole
saws or files. Deburr edges. Follow the safety instructions of the tool manufacturer.
1.
Create a circular hole in the panel considering
the device dimensions. [A]
2.
Remove the spinlock.
3.
Gently remove the bezel using a screwdriver.
[B]
Note: the bezel cannot be used after removal
since damaged.
A
C
WARNING
4.
Place the flush mount seal A2C53215640
(not included) on the instrument glass.
5.
Put the instrument into the drill hole from the
back [C].
6.
Adjust the instrument so that the gauge is
level and fasten it to the stud bolts on the rear
side of the panel, using the flush mount fixing
bracket A2C59510864 (not included) [D].
7.
Insert the connector.
B
D
MECHANICAL INSTALLATION
B001025

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vl flex 52 ibm 12vVl flex 52 ibm 24v

Inhaltsverzeichnis