Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning - clage Zip HydroTap G5 BC 20 Gebrauchs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für Zip HydroTap G5 BC 20:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Zip HydroTap® G5 BC20
4. Installation
EN

Commissioning

1. Before using the unit for the first time, flush through the connecting pipes and
hoses thoroughly. To flush, detach the flexible hose from the water inlet of the
undersink unit and hold it over a drain or bucket. Turn on the water and allow it to
run for several minutes. Then reattach the hose to the water inlet of the undersink
unit and check the installation for leaks.
2. If no leaks are found, plug the supply plug into the socket to activate the unit.
3. The language selection appears on the display. Select your desired language.
4. Then enter the time and the current date. To do this, touch on the text fields,
change the values via + and - and save the entry by tapping on the tick.
5. Specify whether the tap of your Zip unit can drain into a sink or container with
a drain or is only positioned above a tray without a drain. This information is
required for the subsequent tank flushing.
6. A prompt will appear on the display asking you to flush the filter. A container with
a capacity of about 10 litres will be needed to collect the water.
a. Open the service hatch on the front of the unit. Place the end of the plastic hose
in the collecting container and open the valve on the hose.
b. Touch the green arrow to start the flush. The flushing process takes about two
minutes.
c. Close the valve on the hose, stow the hose in the unit and touch the arrow to
continue.
7. Follow the instructions for the subsequent tank rinse. If your tap is installed above
a sink or tableau with a drain, activate the automatic flush function. If not, you
must draw water manually when the corresponding display appears until the tank
is empty.
8. Start temperature calibration, following the instructions on the display. During
this process the boiling point of water will be determined and the boiling water
temperature will be set accordingly. Calibration takes five to ten minutes. During
this time the red lever will flash and steam may discharge from the tap.
9. Booster settings appears. Select "No Booster" to continue.
10. The unit will then be in normal operating mode.
11. Check the water flow and the temperature.
12. Register the appliance online at www.clage.com.
24

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis