Herunterladen Inhalt Inhalt Diese Seite drucken

The Right Grounding; Using The Connector For Testing The Grounding Voltage; Installing The Grounding Post For Grounding Voltage Measurement - VOSS.farming XTREME duo RF Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
6. Press and hold the On/off button (5) for more than 2 seconds to switch the energiser on.
The energiser is switched on and ready for operation.
WA R NI N G
Heat build‑up may result in smouldering. The device must not be covered by
materials etc. during operation as this may lead to a build‑up of heat and possibly
to a fire. Therefore, do not install the device in areas where there is a risk of fire
(e.g. hay and straw stores).
7.3

THE RIGHT GROUNDING

WA R NI N G AGAIN ST E LE CTRICAL VOLTAGES
»
Follow the safety instructions concerning location and installation when
grounding the fence (see section 2.2).
»
Maintain a distance of 10 m to other grounded systems (e.g. protective earthing
of the power supply system or the earthing of a telecommunications system).
»
To prevent possible damage, ensure that animals or other people cannot
access the grounding. However, the grounding must be accessible for any
maintenance tasks required.
It is extremely important that the fence is properly grounded. With optimal grounding, the energiser
can operate at its maximum capacity and ensure that your fence provides the best possible security.
Where possible, select a damp area with vegetation for the grounding.
Use galvanised metal posts for the grounding posts. They must be at least 75 cm long (e.g.
item no. 44219).
If the soil is dry or if the fence is very long, install additional grounding posts at intervals of
about 2–3 m to improve the grounding. We recommend using the cable with item no. 33615 to
connect the grounding posts together.
Tip for corre c t s pac ing
The following rule applies: length of grounding post + length of second grounding post =
min. distance between these two grounding posts (e.g.: grounding post 1 (0.75 m) + grounding
post 2 (1.5 m) = min. 2.25 m distance between the two grounding posts)
7.4

USING THE CONNECTOR FOR TESTING THE GROUNDING VOLTAGE

WA R NIN G AGA IN ST ELE CTRICAL VOLTAGES
»
Follow the safety instructions concerning location and installation when
grounding the fence (see section 2.2).
»
Maintain a distance of 10 m to other grounded systems (e.g. protective earthing
of the power supply system or the earthing of a telecommunications system).
»
To prevent possible damage, ensure that animals or other people cannot
access the grounding. However, the grounding must be accessible for any
maintenance tasks required.
The VOSS.farming Xtreme duo RF is equipped with an extra connector for testing the grounding
voltage (14). The values measured can subsequently be read on the energiser display.

7.4.1 INSTALLING THE GROUNDING POST FOR GROUNDING VOLTAGE MEASUREMENT

1. Place an additional grounding post (length 75 cm) at a distance of roughly 10 m from the
energiser grounding.
I nfo
The greater the distance between the grounding points, the more precise the measurement
will be.
52
INSTRUCTION MANUAL VOSS.FARMING XTREME DUO RF
41550 - 11.2021 - V2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

41550415554156041565

Inhaltsverzeichnis