Herunterladen Inhalt Inhalt Diese Seite drucken

Saunum Professional Bedienungs- Und Installationsanleitung Seite 15

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 68
INSTALLATION
NOTE!
• Before installing the Saunum
Professional be sure that the
sauna steam room is prepared
in accor dance with construction
standards and has been approved
by the fire inspector as is man­
datory.
• The wall and ceiling construction
behind the heater must not con­
tain combustible materials, the
heat accumulating back wall sur­
face materials must be insulated.
• The sauna room shall be provided
with proper ventilation. Insulat­
ing the required air inlet and out­
let flues used is forbidden.
• Before installing the Saunum
Professional climate device be
sure that it is positioned in such
a way that the minimum distance
requirements are met as shown in
Table 1.
28
1. Remove side panels.
2. Remove the protective film and affix flue
with bolts.
3. Before adding the side panels back,
remove the protective film from them.
Use protective gloves to
avoid smearing the side
panel surface.
29

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis