Herunterladen Inhalt Inhalt Diese Seite drucken

Mitsubishi Electric PUHY-P-YHM-A-BS serie Installationshandbuch Seite 6

Inhaltsverzeichnis

Werbung

10
[Fig. 10.2.1]
< B >
B
< A >
C
A
E
D
[Fig. 10.2.2]
<A> Front pipe routing
A09
<C>
543
<C>
No.
IDø19.05
C Shape
2
No.
IDø25.4
C Shape
1
1
PUHY-P200YHM-A
PUHY-EP200YHM-A
PUHY-P250YHM-A
PUHY-EP250YHM-A
PUHY-P300YHM-A
PUHY-EP300YHM-A
PUHY-P350YHM-A
PUHY-P400YHM-A
PUHY-P450YHM-A
<A> Front pipe routing
<C> Included with outdoor unit
A Gas pipe (field supply required)
C Shape
*1 P200, P250, EP200: Expand the liquid pipe (ID9.52) and connect directly to the valve. <field supply required>
*2 P300: To use in combination with other outdoor units, expand the liquid pipe (ID12.7) and connect directly to the valve. <field supply required>
*3 P450: Expand the liquid pipe (ID15.88) and connect directly to the valve. <field supply required>
*4 P400: To use in combination with other outdoor units, expand the liquid pipe (ID15.88) and connect directly to the valve. <field supply required>
*5 P200: Expand the gas pipe (ID19.05) and connect directly to the valve. <field supply required>
6
<A> Refrigerant service valve
(liquid side/brazed type)
<B> Refrigerant service valve
(gas side/brazed type)
A : Shaft
B : Service port
C : Cap
D : Pinched connecting pipe severing portion
E : Pinched connecting pipe brazing portion
12
<C>
678
<C>
A
B
1
3
ODø9.52
ODø19.05
IDø12.7
4
ODø9.52
IDø15.88
ODø25.4
2
3
4
1
1
1
1
1
1
1
1
1
1
1
<B> Bottom pipe routing
B Liquid pipe (field supply required)
10.2
[Fig. 10.2.3]
A
A : Example of closure materials (field supply)
B : Fill the gap at the site
<B> Bottom pipe routing
5
7
ODø12.7
ODø22.2
IDø15.88
IDø25.4
6
8
ODø19.05
ODø28.58
IDø25.4
IDø25.4
5
6
7
1
1
1
1
1
1
1
1
1
B
678
<C>
*5
345
<C>
*1~*4
A
B
9
IDø9.52
ODø9.52
0
IDø12.7
ODø12.7
8
9
0
1
1
1
1
1
1
1
A
IDø15.88
ODø15.88
A
1
1
1
1
1

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis