Herunterladen Inhalt Inhalt Diese Seite drucken

Attachment; Operation; Cleaning And Maintenance - EuroLite UV-TUBE COMPLETE SET Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für UV-TUBE COMPLETE SET:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Attachment

Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's weight.
The device must only be installed absolutely planar at a vibration-free, oscillation-free and fire-resistant
location. Make sure that the device is installed absolutely planar by using a water-level.
The device must be installed out of the reach of people.
The device must always be installed via all fixation holes. Do only use appropriate screws and make sure
that the screws are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1: The holes for the installation are on the baseplate.
Step 2: Hold the baseplate onto the location where the device is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes.
Step 5: Hold the baseplate in the desired position and tighten it.
Before taking into operation for the first time, the installation has to be approved by an expert!

OPERATION

After you connected the device to the mains, the UV-tube lamp needs 3-4 minutes warm-up time until it
reaches full lighting output.
With the ON/OFF-switch, you can switch the device on and off.

CLEANING AND MAINTENANCE

The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
DANGER TO LIFE!
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
13/24
00027051.DOC, Version 2.3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis