Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Attachment - EuroLite LED PIX-12 QCL Leiste Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

WARNING! Risk of injury caused by falling objects
Devices in overhead installations may cause severe injuries when crashing down. Make sure
that the device is installed securely and cannot fall down. The installation must be carried out by
a specialist who is familiar with the hazards and the relevant regulations.
The device may be placed on the floor or fastened to a truss or similar rigging structure. The device must
never be fixed swinging freely in the room.
1
The rigging structure must support at least 10 times the weight of all fixtures to be installed on it.
2
Block access below the work area and work from a stable platform when installing the device.
3
Use rigging hardware that is compatible with the structure and capable of bearing the weight of the
device. Please refer to the "Accessories" section for a list of suitable rigging hardware.
4
Secure the device with a safety bond or other secondary attachment. This secondary safety attachment
must be sufficiently dimensioned in accordance with the latest industrial safety regulations and
constructed in a way that no part of the installation can fall down if the main attachment fails. An
appropriate eyelet is mounted on the device for fixation of the safety rope. Fasten the safety rope in such
a way that, in the event of a fall, the maximum drop distance of the device will not exceed 20 cm.
5
To align the device, release the fixation screws at the mounting bracket, adjust the desired inclination
angle and tighten the fixation screws.
6
After installation, the device requires inspections periodically to prevent the possibility of corrosion,
deformation and looseness.

Attachment

Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's weight.
The device must only be installed absolutely planar at a vibration-free, oscillation-free and fire-resistant
location. Make sure that the device is installed absolutely planar by using a water-level.
The device must be installed out of the reach of people.
The device must always be installed via all fixation holes. Do only use appropriate screws and make sure
that the screws are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1: The holes for the installation are on the mounting bracket.
Step 2: Hold the mounting bracket onto the location where the device is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes.
Step 5: Hold the mounting bracket in the desired position and tighten it.
To align the device, release the fixation screws at the mounting bracket, adjust the desired inclination angle
and retighten the fixation screws
23/34
00122808, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis