Herunterladen Inhalt Inhalt Diese Seite drucken

Assembling The Product; Loading The Equipment Box; Cleaning; Storage - Steinbach Technikbox Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Assembling the product

To assemble the equipment box, proceed as follows:
1
3
1. Use a hole saw to drill the outlets for the lines into the side parts
are designed for a 45 mm or 75 mm hole saw.
2. Insert the bottom part
the individual parts. The inside of the bottom part points down.
3. Insert the two side parts into the front part. The recesses in the side parts are on the bottom.
4. Insert the back part into the bottom part and into the two side parts. This will require some force.
You will hear a dull sound when the back part snaps into place.
5. Put on the cover
6. Position the equipment box at the prepared setup location.
The equipment box is assembled.

Loading the equipment box

Observe the following when loading the equipment box:
- Read the operating instructions for the pool equipment before loading the equipment box.
- Guide the lines to the pool equipment through the recesses in both side parts.
The equipment box is loaded.

Cleaning

Only clean the product with a standard bathroom cleaner, clear tap water and a lint-free cloth.
Aggressive cleaning agents can damage the product. Dry the product with a lint-free cloth.

Storage

Observe the operating instructions for the pool equipment.
After thorough cleaning and drying, store the product in a dry and frost-free place (= +5 °C).

Technical data

Model
Outer dimensions/setup dimensions (L x W x H)
max. inner dimensions (L x W x H)
into the front part
3
.
1
2
1
2
3
3
3
. Pay attention to the positioning of the recesses in
2
036600
910 mm x 680 mm x 830 mm
740 mm x 550 mm x 700 mm
5
2
4
1
. The predefined cutting guides
3
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis