Herunterladen Inhalt Inhalt Diese Seite drucken

Niviuk CIRES Bedienungsanleitung Seite 9

Vorschau ausblenden Andere Handbücher für CIRES:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Check for all the apex lines to have the same length.
7.9 FOLDING PROCESS. DIVIDING THE GORES (CELLS)
Place the suspension lines on the line separator in such way that half
of them are on the left, and half are on the right. Put a weight on the
skirt to secure the canopy down.
(Image
C)
(Image
D)
B
Follow the outer suspension line to find the centre panels and begin
the folding process.
(Image
C
7.10 DIVIDING THE PANELS
First fold all the panels one by one to the right side of the suspension
lines. While doing this, check for any signs of damage or deterioration of
the fabric.
E)
ENG
ES
D
E
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis