Herunterladen Inhalt Inhalt Diese Seite drucken

elco THISION L 50 Betriebsanleitung Seite 25

Vorschau ausblenden Andere Handbücher für THISION L 50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Installation
Air/Flue gas system
Warnings
owner to clean the opening regularly.
Ensure while installation work is
being carried out that no debris such
tar are allowed to remain in the air/
A
C
All manuals and user guides at all-guides.com
-
B
D
Installation
is not damaged.
1
Synthetic tile
2
determine the type of weather
3
terminal
will
With a tile roof use the universal
A.
minal
from
Ensure that no saw dust or dust
gets into the boiler
B. Fit the weather collar and careful-
the roof from the outside.
Warning! Don't turn the cap!
C.
cal position using an air level.
D. Fix the supplied wall clamp round
roof construction, without tighten
the clamp yet.
Concentric
and install these with the clamps in
accordance with the installation in-
structions in the previous pages.
Twin tube
Fit the gasket and the twin tube con-
nection. Make sure that the gasket
tube and the air inlet tube are not
Secure the roof wall clamp and
check that all steps have been
carried out correctly
-
be
positioned.
-
the
outside.
-
-
25
GB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis