Herunterladen Inhalt Inhalt Diese Seite drucken

elco THISION L 50 Betriebsanleitung Seite 20

Vorschau ausblenden Andere Handbücher für THISION L 50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Installation
Air/Flue gas system
Combustion air
drawn from the
B23
room
Air/exhaust gas routing through outside wall in the same
pressure range.
Exhaust gas/fresh air supply system through outside wall.
C13
The Terminal outlets from separate combustion and air supply
put to 70 kW and 100 cm with a heat input from 70 up to 100 kW.
Flue gas exhaust and air suction duct from outside with roof ter-
minal in the same range of pressure.
The Terminal outlets from separate combustion and air supply
C33
with a heat input below 70 kW.
A square of 100 cm and distance between the planes of the two
C43
ducting built into the building.
Combustion
air intake from
outside
Flue gas exhaust leading outside and air suction duct through
C53
external wall not in the same range of pressure
Air and exhaust connection to separate tested and supplied
air / exhaust pipes.
Air and exhaust venting via exterior wall.
Exhaust venting through heat insulated exhaust pipe or moistu-
C63
re-resistant pipe.
Exhaust line (standing air layer) at exterior wall.
The terminals for the supply of combustion air and for the eva-
cuation of combustion products shall not be installed on opposite
walls of the building.
C83
into the building. Air suction through external wall
20
All manuals and user guides at all-guides.com
-

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis