Herunterladen Inhalt Inhalt Diese Seite drucken

hanseatic SY-3288C-E2-C64-L54-900 Gebrauchsanleitung Seite 40

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Page EN-14
Assembly
Pins
5. Place the two halves of the check valve
into the opening on the top of the exhaust
hood. Make sure that the pins on the valve
are facing outwards.
(4)
(14)
(1)
6. For exhaust air operation: Carefully insert
both plastic check valves into the air outlet
opening at the top of the appliance (gently
bend the flaps a little so as not to break off
the sensitive plastic tabs).
Attach the exhaust air hose (4) opening
with a diameter of 153 mm (see marking
on the hose) to the exhaust hood (1) and
secure it with a cable tie (14).
(16)
(3)
(5)
(1)
7. Place the two-piece flue screen (3) over
the mounting rails (5) above the exhaust
hood (1). The end with the ventilation slots
(16) must be facing upwards.
(6)
(4)
(5)
(1)
8. Lift the exhaust hood (1) with two persons
onto the housing, hold it to the base plate
(6) at the top, and screw the mounting rails
(5) to the base plate (6) using four screws
(10), four washers (12) and four nuts (11).
(11) (12) (10)

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis