Installation
1 Install the drainage pipe as shown in the figure:
2 Cover the drainage pipe with a heat-insulating material
to prevent condensate and possible water leaks.
3 Connect the end of the drainage pipe to the unit's
outlet pipe. Wrap the end of the pipe and securely
fasten it with a hose clamp.
Drainage pipe
Metal hose clamp
Drainage pipe
connection hole
4 If connecting more than one drainage pipe, follow the
installation diagram below:
0-53 cm
≥ 10 cm
l
1-1.5 m
1/100 slope
Fig. 11
Insulation
Fig. 12
DRAIN TEST
Fig. 13
Check that the drainage pipe is not blocked.
This test must be carried out in new builds before finishing
the ceiling.
WARNING
– When using an extension for the drainage
pipe, tighten the connection on the inside
with an additional protection pipe to stop it
from coming loose.
– The drainage pipe must slope by at least
1/100 to prevent the water from flowing back
into the air conditioner.
– To stop the pipe from bending, fix the
suspension elements every 1-1.5 m.
– If the drainage pipe outlet is higher than the
pump fitting on the unit body, use a lifting
pipe for the discharge outlet of the indoor
unit. The lifting pipe must be installed no
more than 75 cm from the false ceiling and
no further than 30 cm from the unit. Incorrect
installation can cause the water to flow back
into the unit.
– To prevent air bubbles from forming, keep
the drainage pipe horizontal or slightly
inclined upwards (<75 mm).
Ceiling
≤30 cm
1 - 1.5 m
0 - 75 mm
(3")
≤53 cm
≤75 cm
22 cm
Fig. 14
15