Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Getting Started; Wireless 7-In-1 Sensor Array; Install Batteries; Install Mounting Pole - Bresser ClimateConnect Tuya Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. INSTALLATION AND GETTING STARTED

3.1 WIRELESS 7-IN-1 SENSOR ARRAY

1. Antenna
2. Rain collector
3. UVI / light sensor
4. Mounting pole
5. Mounting base
6. Balance indicator
7. Wind cup
8. Radiation shield
9. Wind vane
10. Red LED indicator
11. [ RESET ] key
12. Battery door
13. Mounting clamp
14. Rain sensor
15. Tipping bucket
16. Drain holes

3.1.1 INSTALL BATTERIES

Unscrew the battery door at bottom of unit and insert the
batteries according to the +/- polarity indicated.
Screw the battery door compartment on tightly.
NOTE:
- Ensure the water tight O-ring is properly aligned in place to
ensure water resistant.
- The red LED will begin flashing every 12 seconds.

3.1.2 INSTALL MOUNTING POLE

Step 1
Insert the top side of the pole to the square hole of the
weather sensor.
NOTE:
Ensure the pole and sensor's indicator align.
Step 2
Place the nut in the hexagon hole on the sensor, then
insert the screw in other side and tighten it by the
screw driver.
1
2
3
4
5
10
11
12
6
7
13
8
9
14
15
16
8

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

7003600cm30007003600gye0007003600qt5000

Inhaltsverzeichnis