Herunterladen Inhalt Inhalt Diese Seite drucken

GUTMANN Palma 10/1001 I/W Montageanleitung Seite 41

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Ceiling - island mounting
1 = Lower tower
2 = Upper tower
3 = Motor module
5 = Screw connection points
6 = Bonnet body
12.Push the canopy body with motor module from below into the tower until the screw
connection points are congruent. Then screw in the 4 M5 connecting screws, align the
canopy, tighten the screws.
13.Loosen the lower tower by removing
the adhesive strips and pull it down-
wards until it stands on the canopy.
14.Carry out a function test.
After completion of the assembly work we recommend cleaning the stainless steel
surfaces with our special cleaner TZ 710. For cleaning the glass surfaces we recommend
the glass cleaner Art. No.: 05999704. For aluminium surfaces use a soft microfibre cloth.
Do not use dry cloths. Use a mild window cleaning agent and no aggressive, acidic or
alkaline cleaners !
ASSEMBLY INSTRUCTIONS
EN
41

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Campo 05/0501 i/wSombra 68/6801 i/w

Inhaltsverzeichnis